GUILDELINESTitleRev. DateSecurityVersion NoAuthor  MSE Code:PDO lift planUnrestrictedAuditplan letter  MSE CodeMCCGU-725 – Health Risk Assessment6/14/2014Unrestricted1.0Jose F.Petrizzo  MSE CodeMSE/1GU-140 – C9 HSE Specification (Contracts)11/30/2015Unrestricted4.0CORPORATE HSE12GU-653 Behaviour Based Safety Behaviour Based SafetyUnpublishedGU-432 – Road Transport HSE CASE7/1/2003Unrestricted1.0John Graham/Andrew Ure/Tony van ThielGU-375 – Guideline for conducting Defect Elimination Analysis (Root Cause Analysis & Failure Investigation)UnpublishedGU-377 – Guideline for carrying out Reliability Centered Maintenance (RCM) AnalysisUnpublishedGU-432 A – Appendix – Road Transport HSE CASE7/1/2003Unrestricted1.0Andrew Ure (CSM/15X)/John Graham (CSM/15)GU-437 – Guideline on SIL Assessments and Implementation Guideline5/1/2009Restricted2.0Salim Hinai, UESGU-445 – Transport Operations Guidelines9/1/2012Restricted1.2Omar HassanGU-463 – Task Risk Assessment3/1/2012Unrestricted3.0UOP63GU-501 – Guidelines for Excavating and Working Around Live Pipelines9/15/2011Unrestricted2.0Said Al Asmu UIPGU-690 – Guidelines for Controlling Reversing Vehicle3/1/2013Unrestricted0.0Hamed Khalfeen /hsems/Documents/Guidelines/GU 690.GU-363 Guidance Working at Height and Access9/30/2013Unrestricted3.0Simon HughesGU-273 – PTW Job safety plan7/15/2002Unrestricted1.0Hamed S. Al-KhalfeenWinch Operation Lift PLan2/2/2017Unrestricted0.0Jamoudi, Khalifa UEQ3  MSE CodeMSE/2GU-195 – Environment Assessment Guideline1/25/2009Unrestricted0.4Lawati, Nabil MSE24GU-447 – Integrated Impact Assessment Guidelines1/25/2009Unrestricted0.3Shuayli, Mohammed MSE2GU-634 – Guidelines for Sampling of Sewage for Sewage Treatment Plant11/1/2009Unrestricted1.0Head MaintenanceGU-643 – Green IT Strategy8/10/2010Restricted1.4Ramon Fernandez – UIIC2  MSE CodeMSE/4GU-611 – PDO Guide to Engineering Standards and Procedures6/1/2014Unrestricted2.0UEOI/515GU-625 – PDO Operations and Maintenance Related Documents6/1/2014Unrestricted17.0UEOI/515GU-648 – Guide for Applying Process Safety In Projects12/15/2010Unrestricted1.0MSE4 – Head of Technical Safety EngineeringGU-655 Demonstrating ALARPUnpublishedGU-230 – Fire and Explosion Risk Management (FERM) Facility plan Guideline7/15/2002Unrestricted2.0Hamad Khalfeen, CSM/11GU-289 – PDO Security Guide1/1/2009RestrictedUIDGU-425 – GU-425 Contracting and Procurement Guidelines7/30/2011RestrictedFPMGU-513 – Guidelines for Alarm Management and Rationalisation12/1/2009Unrestricted2.0Salim Hinai, UESGU-622 – Contract Performance Management (CPM) Framework Guideline4/1/2014Restricted2.0FPMGU-632 – Water Management Control Framework Guideline10/1/2009Restricted1.0Leverton, Kirsten, UCG  MSE CodeMSE/5GU-464 – HSE Guideline: HSE is Teamwork1/1/2004Unrestricted0.1Younis Al-Hinai XPSGU-573 – HSE Guideline – Managing HSE Issues in Company organised or supported Field trips and Social Events11/30/2006Restricted1.0Naaman Al-NaamaniGU-612 – Incident Notification and Investigation Guideline1/6/2014Unrestricted3.1Shaqsi, Talib MSE54GU-624 – Permit to Work Licensing Guidelines3/1/2011Unrestricted2.0Robin Norman UOP6 /GU-441 Level 2 and 3 HSE Audit Rev 22/11/2014Restricted2.0Clarke, Vaughan MSE53GU-673 – Guidelines for HSE Training1/2/2012Restricted1.1IanPR-2010 I – HSE Training Procedure1/23/2012Unrestricted1.1Ian Bowen  MSE CodeUIC/4GU-288 – Emergency Response Document Part IV, Guidelines9/30/2013Restricted3.0infrastructure DirectorGU-576 – Blowout Contingency Plan12/1/2012Restricted2.1Maarten van den  OTHERSTitleRev. DateSecurityVersion NoAuthor  MSE Code:Suitability check list mobile cranes for man ridingOPERATOR DAILY CHECKLISTUnrestricted  MSE CodeMSEMCP-122 HSE Code of Practice7/1/2011Unrestricted5.0Saeed Al MamariCP-122 Summary (Arabic-English)7/1/2011Unrestricted5.0Saeed Al Mamari  MSE CodeOthersCP-102 – Corporate Document Management11/12/2007Restricted5.1UID – Infrastructure DirectorCP-107 – Corporate Management Framework1/1/2014Restricted7.0MDCP-111 – Relationship With Stakeholders5/1/2004Unrestricted2.0CSM/6CP-114 – Maintenance & Integrity Management3/1/2009Unrestricted5.0Robin Norman UOP6CP-115 – Operation of Surface Product Flow Assets9/16/2013Unrestricted8.0Robin Norman UOP61CP-117 – Project Engineering6/1/2012Unrestricted5.0Pual SandersCP-118 – Well Lifecycle Integrity9/1/2006Restricted5.0Robin Gardiner UPT/2CP-126 – Personnel and Asset Security5/1/2000Restricted3.0Richard A. Kraak CSM/4CP-129 – Contracting and Procurement5/1/2009Restricted2.0Hamood Al Hadhramy, FPS/11CP-131 – Risk and Opportunity Management9/1/2006Restricted3.0FCCCP-162 – Internal Communication9/1/2003Unrestricted1.0Mohammed Kharusi / HDCP-100 Policy Approval2/1/1998Unrestricted1.0Brian Ward, MDCP-109 – Delegation of Authority6/1/1998Restricted1.0Ian Duncan, / FCM/Lubna Kharusi,CP-116 – Information Planning and Appraisal3/1/2003Restricted2.0Emeka Nwakaeze, TCPCP-127 – IM & T Security4/4/2012Restricted4.1UII – Faiza RahmatullahCP-130 – HLD COP for Learning & Development Services5/1/2004Unrestricted2.2Shashi Marathe HLD 31CP-132 – Logistics Services4/1/2014Restricted1.4Saif AlNadabi, UWL412CP-136 -Planning in PDO9/1/1999Unrestricted1.0V.R. Holtam (CLM)CP-139 – Corporate Data Management2/1/2009Restricted3.0Alessandro Allodi UIIMCP-141 – Use of Concession Land by Third Parties2/1/2012Restricted1.0HXM5CP-145 – Optimisation Management6/1/2001Unrestricted1.0Blair, UPTCP-146 – Social Investment11/1/2000Unrestricted1.0CAM23CP-148 – Media Relations5/1/2008Restricted2.0HXM25CP-152 – Resourcing and Leadership Development12/23/2003Unrestricted1.0HRD (UHH)CP-156 – Integrated Activity Planning12/1/2006Restricted1.3UOP/3 (CDFP)CP-174 – Omanisation1/1/2003Restricted1.0Hussam Nabhani, HOMCP-180 – Recruitment9/1/2003Unrestricted1.0Badran Al Hinai, HRD/1CP-190 – Quality Management System for Project Delivery10/6/2009Unrestricted1.0G BristonCP-193 – Inventory Management5/1/2014Restricted2.0Mathla Barwani, FPP11CP-196 – Surplus Materials Management9/1/2013Unrestricted2.0Abdulla Al Harthy – FPP  MSE CodeUICCP-123 – Emergency Response Documents Part I1/1/2006Unrestricted3.0Corporate Emerg.  PROCEDURETitleRev. DateSecurityVersion NoAuthor  MSE Code:Audit Checklist for Lifting equipment. operations 2.13UnrestrictedCategorising Lifting OperationsUnrestrictedColor Code Requirements in PR-1708UnrestrictedMD-2868/3/2015UnrestrictedSP-2202 Specification for Electric Overhead Travelling Cranes3/24/2016Unrestricted1.0Mcfarland, Samuel UEQ  MSE CodeMCCPR-1243 – Emergency Procedures Part III, Contingengy Plans Volume 13 Medical Emergencies10/26/2008Restricted8.0Dr. Nasser al-Azri MOC/11n & Dr. Salim Al-Sawai MCPR-1243B – Emergency Procedures part III- Vol 12 Medical Emergency Response Manual Part II- Site Specific MER Procedure10/26/2008RestrictedDr. Nasser al-Azri MOC/11n  MSE CodeMSE/1PR-1972 Safe DriverUnpublishedPR-1973 Safe VehicleUnpublishedPR-1974 Safe JourneyUnpublishedPR-1042 – General Operational Safety2/2/2002Restricted1.0TWM/92PR-1171 – Part I Contract HSE Management – Mandatory for PDO Personnel Involved in Contract Management11/30/2015Unrestricted6.0HSE Team Lead – HSE in ContractsPR-1171 – Part II Contract HSE Management – Mandatory for Contractors & Contract Holders11/30/2015Unrestricted6.0HSE Team Lead – HSE in ContractsPR-1045 – Hazardous Substances12/8/2001Unrestricted1.0TWM/92PR-1827 – Exploration Office Safety Procedure11/14/2009Restricted1.1Younis Al-Hinai XPSPR-1993 IVMS-GU-PR-20139/1/2013Restricted1.1Hamed Al EsryPR-1997 – Contractor HSE Technical Evaluation (Banding)4/21/2012Restricted1.0Kelvin Doyle MSE/12  MSE CodeMSE/2PR-1084 – Leak / Spill Management, Site Clean-Up and Restoration8/25/2010Unrestricted3.0Robin Norman UOP6PR-1419 – Abandonment and Restoration Procedure5/1/2008Unrestricted3.0Robin Norman UOP6PR-1975 Waste Management1/2/2011Restricted1.0Mohamed Al-Shuaily MSE2PR-1976 Environmental PermittingUnpublishedPR-1103 – Chemical Injection1/1/2012Unrestricted3.0Allan Grieve (UOP)PR-1278 Chemicals Receipt and Storage Procedure3/1/2015Restricted1.4Sulaiman Al ShaqsiPR-2018 – Laboratory Chemicals Management Emergency Procedure3/1/2012Unrestricted1.0Salim Mohammed Al Maawaly  MSE CodeMSE/4PR-1000 – Operations Handover Procedure7/1/2011Unrestricted5.0Robin Norman (UOP6)PR-1696 – HAZOP Procedure6/1/2012Restricted3.0Randa NabulsiPR-1971 HAZID Procedure9/1/2011Unrestricted1.1Robin Norman UOP6PR-1029 – Competence Assessment & Assurance1/1/2012Unrestricted4.0Jan Vossen, UOP5SPR-1047 – Well Integrity Maintenance4/1/2007Unrestricted2.0Christian ChoepshenPR-1048 – Well Control / Well Kill5/1/2012Restricted2.0Hamood Al-HabsiPR-1076 – Isolation of Process Equipment Procedure5/1/2012Unrestricted6.0Robin Norman UOP6PR-1232 – Design Integrity Review Procedure2/29/2012Restricted2.0Ian Jewitt, MSE4PR-1233 – Contract & Procurement Procedure (CPP)3/1/2014Confidential2.0FPB3PR-1961- Process Leak Management4/1/2011Unrestricted1.0Robin Norman UOP6PR-1172 – Permit to Work Procedure12/31/2015Unrestricted9.0Harrasi, Ali UOPPR-1154 – Gas Testing Procedure10/1/2010Unrestricted4.1Robin Norman UOP6PR-1001a – Facility Change Proposal Procedure10/1/2014Unrestricted5.1Robin Norman UOP61PR-1001b – Trip Alarm SCADA Settings Change Procedure5/1/2012Unrestricted3.0Robin Norman UOP6PR-1001c – Temporary Override of Safeguarding System Procedure10/1/2014Unrestricted6.2Robin Norman UOP61PR-1001e – Operations Procedure Temporary Variance10/1/2014Unrestricted6.1Philip Hatherton UOP61PR-1001x – Operations Variance and Change Management9/1/2007Unrestricted2.0UOP6PR-1002 – Operations Excavation Procedure1/1/2012Unrestricted6.0Robin Norman UOP6/ Dell Ellbec UOP7PR-1005 – Maintenance and Inspection Activity Variance Control Procedure8/1/2010Unrestricted4.0Robin Norman UOP6PR-1023 – Automation Systems Software Management Procedure4/24/2013Restricted5.0UEOA311PR-1489 – Well Test Operations3/1/2011Restricted3.0Mohammed Al-JabriPR-1034 – Wireline Operations Procedure7/1/2012Restricted3.0Hassan RashidPR-1035 – Well Pulling Hoist Operations3/1/2013Restricted6.0Hassan RashidPR-1036 – Coiled Tubing Operations7/1/2007Restricted2.0Ahmed BenchekorPR-1038 – Workshop Operations7/1/2007Restricted2.0Tariq Al RiyamiPR-1039 – High Pressure Operations – Fracture Stimulation Operations Procedure4/1/2000Unrestricted0.0OTW/1 – TWX/4PR-1052 – Preparation and Updating of Station Plant Operating Manuals9/1/2013Unrestricted5.0Robin Norman UOP61PR-1073 – Gas Freeing, Purging and Leak Testing of Process Equipment and Pipework4/1/2011Unrestricted4.1Robin Norman UOP6PR-1079 – Gas Freeing and Purging of Petroleum Storage Tanks4/1/2012Restricted4.0Robin Norman UOP6PR-1083 – Safe Working on the Roof of a Floating Roof Tank5/1/2010Unrestricted3.0Robin Norman UOP6PR-1086 – Locked Valve and Spectacle Blind Control5/1/2013Unrestricted6.0Robin Norman UOP61PR-1088 – Organisational & Staff Changes Process Control8/17/2008Restricted1.0UEPPR-1098 – Well Activity Coordination and Control3/1/2012Unrestricted4.0Robin Norman UOP6 / Del Ellbec UOP7PR-1106 – Changes and Administration of Authorities1/1/1998Unrestricted2.0FCMPR-1159 – Commissioning and Start-up11/1/2011Unrestricted2.0Robin Norman UOP6PR-1247 – Project Change Control & Standard Variance Procedure5/21/2012Unrestricted4.1Paul Frost UEP/3PR-1473 – Well Barrier & Isolation7/1/2011Restricted2.0Hamood Al-HabsiPR-1721 – Shutdown Management1/1/2012Unrestricted3.0UOP3PR-1947 – Electrical Safety Rules10/1/2010Restricted9.0Salim Rawahi, UIE/3SPR-1948 – Electrical Safety Operating Procedures10/1/2010Unrestricted10.0UIE/3SPR-1960 – Control of Portable Temporary Equipment5/1/2013Unrestricted2.0Robin Norman UOP61PR-1710 – Lifting Equipment Numbering Procedure4/1/2012Unrestricted0.0Khalifa al JamoudiSP-2062 -HSE Specifications for HSE Cases4/18/2017Unrestricted2.0Lanke, Vijaya Kumar MSE42  MSE CodeMSE/5PR-1081 – The Buddy System Procedure4/1/2011Unrestricted4.0Robin Norman UOP6PR-1148 – Entry into a Confined Space Procedure7/1/2011Unrestricted4.0Robin Norman UOP6PR-1263 – Managing HSE in Exploration Directorate9/1/2008Unrestricted4.0Younis Al Hinai XPSPR-1264 – Exploration HSE Procedure (Deep Oil)9/1/2008Unrestricted4.0Younis Al Hinai XPSPR-1357 – HLD – HSE Procedure for Learning and Development Centres2/1/2004Unrestricted3.2Mohamed Saleh Al-Harthy, HLD/6PR-1418 – Incident Notification and Investigation11/14/2013Unrestricted3.1Chris Evans MSE54PR-1433 – HSE Management in Exploration Laboratory10/1/2009Unrestricted7.0Jan Schreurs XGLPR-1453 – Hazardous Substances8/1/2004Unrestricted2.0I.K.Naamani, TWX/91PR-1501 – Fire Brigade Procedure1/1/2004Resticted1.0Nasser Al Mahrooqi – TTS/3PR-1515 – Onsite Mercury Management Procedure4/1/2011Unrestricted2.0Rudy van Borkhove GGO22R / Robin Norman UOP6PR-1712 – Level 3 Audit (Engineering Operations)5/12/2012Unrestricted2.0Ian Jewitt MSE4PR-1797 – PDO Airports Safety Management System5/18/2011Unrestricted9.1Sulieman Al ShaqsiPR-1829 – Exploration Worksite Hazards Procedure11/14/2009Restricted1.1Younis Al-Hinai XPSPR-1830 – Exploration Contractor HSE Management Procedure11/14/2009Restricted1.1Younis Al-Hinai XPSPR-1957 – Issue Identification and Management Process4/1/2007Restricted1.0HXM6PR-1969 Corporate HSE Audits4/1/2012Unrestricted1.1Younis Hinai/Corporate HSE AuditorPR-1970 HSE-MS Review12/1/2011Restricted0.0Nivedita Ram / MSE/11PR-1980 HSE Competence Assurance4/1/2014Restricted1.0Mohammed SalmaniPR-1981 Chemical ManagementUnpublishedPR-2010 II – HSE Training Provision Approvals and Quality Assurance11/26/2015Unrestricted1.4Abdulla Brumy PCL8PR-2010 I – HSE Training Procedure2/1/2012Unrestricted1.1Ian Bowen  MSE CodeOthersPR-1418 – Incident Notification and Investigation11/14/2012Unrestricted3.1Chris Evans MSE54  MSE CodeUIC/4PR-1066 – Emergency Response document Part III Contingency Plan, Volume III Production Operations6/5/2012Unrestricted8.0Ruban, Roman UOP64PR-1067 – Emergency Response Documents Part III, Contingency Plan Volume 4 Main Oil Line11/3/2012Unrestricted9.0UIP6PR-1068 – Emergency Response Document part III Contingency Plan Volume V Terminal & Tank Farm Operations2/14/2014Restricted6.0UIPT33 – Under RevisionPR-1069 – Emergency Response Document Part III Contingency Plans Volume VI Marine Operations6/14/2016Unrestricted7.0Ahmed Atiq UIPT34PR-1091 – Operations Emergency Telephone Network Procedure1/1/2011Unrestricted4.0Robin Norman (UOP6)PR-1147 – Operational Integrity Testing of Fixed Firefighting Systems9/5/2011Unrestricted3.0Ruban, Roman UOP64PR-1168 – Emergency Response Documents Part III, Contingency Plan Volume VII Power Systems Operations Interior3/1/2009Restricted7.0UIE/3PR-1223 – Emergency Procedures Part III, Contingency Plans Volume 12 External Affairs & Communications8/1/2008Restricted7.0HXM/2PR-1243 – Emergency Procedures Part III, Contingency Plans Volume 13 Medical Emergencies9/1/2008Restricted8.0Saud Al LAmkiPR-1243B – Emergency Procedures part III- Vol 12 Medical Emergency Response Manual Part II- Site Specific MER Procedure5/10/2008Restricted1.0MCO11NPR-1246 – Emergency Procedure Part III, Contingency Plans Volume 14 Government Gas System6/1/2013Unrestricted10.0GGO/61PR-1275 – Emergency Procedure Part III, Contingency Plans Volume 15 South Oman Gas line3/24/2014Unrestricted5.0UIPT/32PR-1287 – Emergency Procedures part III Contingency Plans, vol II Well Engineering Operations3/30/2014Restricted9.0Shukri, Mahmoud (UWZ)PR-1299 – Management of First Aid and Evacuation Within Corporate Affairs Department11/24/1999Unrestricted1.0CSM/4PR-1301 – Emergency Procedures part III Contingency Plans, vol II Personnel Centre1/1/2009Unrestricted8.0HRO/4PR-1329 – Emergency Procedures part III Contingency Plans, vol 10 Mina al-Fahal Ras Al- Hamra Building3/24/2014Unrestricted5.0UIPT/32PR-1447 – Emergency Well Control for Central Oman LNG Gas Wells5/1/2012Restricted2.0Hamood Al-Habsi/ Ibrahim Al-Far’eiPR-1618 – Emergency procedures during operation demand11/1/2004Unrestricted1.0Mohammed Al-Aghbari TTE/3PR-1656 – Emergency Response Document Part III Contingency Plans Volume 8 – Information Management & Technology3/1/2012Restricted4.0Said Wardy UIIO/13PR-1707 Disclosure Procedure6/8/2009Restricted2.0Najla Al RiyamiPR-1789 – Corporate Business Continuity Plan (BCP)10/1/2011Restricted2.0UIC/4PR-1802 – PDO Fahud Emergency Plan1/19/2012Restricted4.0Suliman Al ShaqsiPR-1805 – PDO MARMUL Emergency Plan3/1/2009Unrestricted0.7Warith Al KharousiPR-1808 – PDO Qarn Alam Emergency Plan5/1/2009Unrestricted4.1Sulieman Al ShaqsiPR-1958 – Suspected Object Bomb ThreatUnpublishedPR-1065 – Emergency Response Documents Part II – Company Procedure9/23/2013Restricted6.0Head of Corporate Emergency Management  SPECIFICATIONSTitleRev. DateSecurityVersion NoAuthor  MSE Code:SP-2275 – Lifting and Hoisting Procedure Inspection Testing and Certification10/1/2018Unrestricted0.0Sultan Al Qwaisi, UEQ  MSE CodeMCCSP-1170 Naturally Occurring Radioactive Materials (NORM)10/1/2010Unrestricted4.0Brett YoungSP-1218 – Radioactive Sources6/1/2013Restricted2.1Harib Busaidi UWSC2SP-1230 Medical Examination, Treatment and Facilities10/25/2016Restricted4.0Dr. Salim Al Sawai MCOHSP-1231 Occupational Health3/1/2014Restricted4.0Jose PetrizzoSP-1232 Public Health8/22/2017Unrestricted8.1Dr. Salim Al Sawai MCOHSP-1233 Smoking, Drugs and Alcohol7/1/2002Unrestricted2.0Wayne AustinSP-1237 Ionising Radiation5/1/2011Unrestricted2.0CSM/3SP-2222 Heat Stress Standard V1.0 (OPAL Standard)5/24/2017Unrestricted1.0Sawai, Salim MCOH  MSE CodeMSE/1SP-2273 Specification for Lift Planning and execution4/1/2016Unrestricted1.3Jamoudi, Khalifa UEQ3SP-1256 – HSE Specification – Camps, Offices, Labs, Workshops and Industrial Safety10/5/2008Unrestricted2.0MSEMSP-1257 Work at Height and Access10/25/2016Unrestricted4.0Kevin Doyle MSE1SP-2001 Load Safety and Restraining2/24/2003Unrestricted1.0John Graham (CSM/15)SP-2085 – PDO Oilfield Transport & Interior Based Vehicle Specifications11/1/2008Unrestricted1.0Stephen Rice, UWLC/1SP-2097 – WE Specification for the Prevention of Dropped Objects10/1/2009Restricted1.0Ray CorbettSP-1234 Personal Protective Equipment8/1/2012Unrestricted3.0Nivedita Ram/Sr. Behavioural/Safety AdvisorSP-1259 Safety Training Observation Programme (STOP)2/23/2010Unrestricted3.0Kholoud IsmailSP-2000 Road Safety Standard (OPAL Standard)5/1/2017Unrestricted4.0Hamed Al-Esry (MSE7) & Slobodan Lazic (MSE73)  MSE CodeMSE/2SP-1008 Conservation of Natural Resources9/1/2007Restricted3.0Mariana Michael MSE/22/Maisoon Riyami CSM/21SP-1010 Environmental Noise1/1/2009Restricted3.0Khalifa Al Harthy/Ref. Ind: MSE/2SP-1011 Biodiversity9/1/2007Restricted4.0Mariana Michael MSE/22/Mohammed Al Shuayli MSE/24SP-1012 Land Management9/1/2007Restricted4.0Mariana Michael MSE/22/Mohammed Al Shuayli MSE/24SP-1225 – Environmental Management6/1/2001Unrestricted1.0Julian Barlow/Steve Williams TWB/YSP-1013 – HSE Specification – Environmental Permitting1/25/2009Restricted3.0Nabil AL Lawati MSE/25SP-1170 – HSE Specification – Naturally Occuring Radioactive Materials10/15/2014Restricted5.0CFDH- Occupational HealthSP-1194 Chemical Management1/1/2014Restricted1.0Sail-Al-HarmaliSP-2194 – Specification for Environmental Management11/30/2015Restricted1.0MSEM  MSE CodeMSE/4SP-1127 – Layout of plant equipment and facilities10/1/2010Restricted3.0Ian Jewitt (MSE4)SP-1258 Quantitative Risk Assessment (QRA)7/13/2010Restricted3.0Ahmed Al-Abri, MSE/45QSP-1131 – Handover and As-built documentation10/1/2013Unrestricted4.0Kingsley Chime UEOI/12ASP-1190-1 – H2S & SO2 Management – The Basics, Classification and Sour Contracts8/24/2015Restricted4.0MSE/4 – CFDH Technical Safety EngineeringSP-1219 – Well Engineering Hydrogen Sulphide Specification2/1/2011Restricted3.0Danny Byrne, UWXG, Christian Koepchen, UWH/2SP-1278 – Specification for Site Selection and Soil Investigation Works Engineering Guidelines5/1/2004Unrestricted1.0Ali Nasser Al Jahadhamy, UIB/4 (UEB)SP-1284 – Signs and Signboards9/1/2009Unrestricted2.0Ali Nasser Al Jahadhamy, UIB/4 (UEB)SP-2017 – Well Failure Model2/1/2011Restricted3.4UPTSP-2061 – Technical Authority System6/1/2010Unrestricted2.0Ali Wardy UEQ/2SP-2113 – Specification for Commissioning and Start-Up (Key Principals)12/1/2010Unrestricted1.0Robin Norman UOP6SP-2110 – AI-PSM Assurance FrameworkUnpublishedSP-1075 – HSE Specification – Fire and Explosion Risk Management (FERM)9/30/2014Restricted3.0Bose, Rajib MSE44SP-1190-4 – H2S & SO2 Management – Operations8/24/2015Restricted4.0MSE/4 – CFDH Technical Safety EngineeringSP-1190–3 – H2S & SO2 Management – Engineering Design8/24/2015Restricted4.0MSE/4 – CFDH Technical Safety Engineering  MSE CodeMSE/5SP-1157 HSE Training7/5/2017Unrestricted2.5Brumy, Abdulla PCL8SP-2087 – Specification for Onsite Mercury Management10/1/2010Unrestricted0.0Robin Norman UOP6SP-2037 Well Engineering Specification for the Use of Equipment in Hazardous Areas6/2/2013Restricted1.0Tariq Al-Riyami (UWH)  SUPPORTTitleRev. DateSecurityVersion NoAuthor  MSE Code:Accredited Lifting Operations Personnel Training InstitutesUnrestrictedAppr. Crane Companies ListUnrestrictedSafety alertsUnrestrictedNotesUnrestricted  MSE CodeMSE/1Approved Lifting Inspection Agencies (LIA)1/22/2014Unrestricted1.0DEN BOOGERT, HUGO UEQ31List of PDO Qualified Lifting Inspectors List1/22/2014Unrestricted  MSE CodeMSE/5Template Email for internal and external notificationUnrestrictedForm for Initial NotificationsUnrestrictedTemplate Email from Operations to Senior PDO ManagementUnrestrictedMemory aid Activity at the TimeUnrestrictedMemory aid Activity beforehandUnrestrictedMemory aid EnvironmentUnrestrictedMemory aid EquipmentUnrestrictedMemory aid Injured personUnrestrictedMemory aid Management informationUnrestrictedMemory aid Other partiesUnrestrictedMemory aid Third partiesUnrestrictedForm for Minor and Low Incident InvestigationUnrestrictedTemplate Statement of Fitness to RestartUnrestrictedForm for Road Traffic Incident InvestigationUnrestrictedForm for Medium Potential Incident InvestigationUnrestrictedTemplate Medium and High Incident Investigation ReportUnrestrictedTemplate Non Accidental Death Investigation ReportUnrestrictedTemplate IRC Powerpoint presentationUnrestrictedTemplate IRC Redline Action Close Out presentationtUnrestricted
Note: Documents marked as “Restricted” Cannot be accessed on the www website, please contact your Contract Holder for copies